H12-425_V2.0-ENU HCIP-Data Center Facility Deployment V2.0 Real Questions
You can get the latest H12-425_V2.0-ENU HCIP-Data Center Facility Deployment V2.0 Real Questions from PassQuestion to best prepare for the real exam. If you are using H12-425_V2.0-ENU HCIP-Data Center Facility Deployment V2.0 Real Questions, then you will be able to clear your lost concepts. It is highly recommended to go through detailed H12-425_V2.0-ENU questions and answers so you can clear your concepts before taking H12-425_V2.0-ENU exam. It is the right way to proceed so you can easily manage things in an efficient way. H12-425_V2.0-ENU HCIP-Data Center Facility Deployment V2.0 Real Questions will also give you a clear idea of how you can take a real exam. It will help you assess your current preparation level so you can pass your H12-425_V2.0-ENU exam successfully.
HCIP-Data Center Facility Deployment
Holding an HCIP-Data Center Facility Deployment certification, you will be able to have a basic command of Huawei modular data center solution, power distribution system solution, cooling system solution, and monitoring system solution, and be able to work as a pre-sales engineer, deployment and commissioning engineer, and solution engineer for data center infrastructure. It is recommended that you learn HCIA-Data Center Facility in advance.
Certification: HCIP-Data Center Facility Deployment
Exam Code: H12-425
Exam Name: HCIP-Data Center Facility Deployment V2.0
Exam Type: Written examination
Exam Format: Single-answer Question,Multiple-answer Question,True or false,Short Response Item,Drag and Drop Item
Time: 90min
Passing Score/Total Score: 600/1000
Exam Cost: 160USD
Language: Chinese,English,Portuguese
HCIP-Data Center Facility Deployment V2.0 Exam Knowledge Content
1.Introduction to Huawei Data Center Infrastructure 2%
2.Introduction to Modular Data Center Solution FusionModule2000 and 5000 5%
3.Introduction to Prefabricated All-in-One Data Center Solution FusionDC1000 3%
4.Introduction to Smart Mini and Small Data Center Solution FusionModule500 and 800 3%
5.Integrated UPS Introduction 3%
6.FusionModule2000 Installation 5%
7.Application of VRLA Batteries 3%
8.Huawei SmartLi Introduction, Installation, and Commissioning 3%
9.UPS2000 Product Introduction 3%
10.UPS2000 Installation 2%
11.UPS2000 LCD Operations and Commissioning 3%
12.UPS5000 Product Introduction 7%
13.UPS5000 Installation 2%
14.UPS5000 LCD Operations and Commissioning 8%
15.PDU8000 Modular PDF Introduction 3%
16.Introduction to Data Center Cooling Solutions 3%
17.Introduction to Huawei Air-Cooled Precision Air Conditioner 3%
18.Introduction to Huawei Chilled Water Precision Air Conditioners 3%
19.Introduction to the Huawei Modular Indirect Evaporative Cooling System 2%
20.NetCol5000-A042 Installation and Commissioning 9%
21.NetCol8000-C (070-260) Installation and Commissioning 3%
22.NetCol8000-E220 Installation and Commissioning 2%
23.ECC800-Pro Introduction 6%
24.Huawei DCIM Management Tool Introduction 6%
25.Huawei DCIM Product Introduction 8%
View Online HCIP-Data Center Facility Deployment V2.0 H12-425_V2.0-ENU Free Questions
What can users do through the ECC800WEB interface? (Multiple choice)
A. Real-time monitoring of equipment status
B. Query version information
C. Export historical data
D. Software Upgrade
Answer: ABCD
What are the main components of the natural cooling source system? (Multiple choice)
A. Direct ventilation and natural cooling
B. Natural cooling by runner heat exchange
C. Natural cooling on the water side
D. Chilled water cooling scheme
Answer: ABC
What are the alarm management functions supported by the ECC800? (Multiple choice)
A. View historical alarms
B. Filter alerts
C. Alarm data export
D. Alarm parameter setting
Answer: ABCD
Which type of compressor is used in new room-level air cooling?
A. AC inverter compressor
B. Digital scroll compressor
C. Fixed frequency compressor
D. DC inverter compressor
Answer: B
When the UPS2000G battery status is NA, what could it be?
A. The battery is not connected
B. Battery Low Voltage
C. The battery connection is normal
D. The battery N line is not connected
Answer: A
What could be the cause of damage to the NETCOL5000-C insulation?
A. The fan noise is too loud
B. The drainage capacity of the equipment is significantly reduced
C. Pipeline condensation
D. The fan is blocked
Answer: C
What is the possible cause of the high discharge temperature of the NETCOL5000-A air conditioner compressor? (Multiple choice)
A. Refrigerant circuit or device blockage
B. The installation position of the outdoor unit is wrong
C. The condenser is dirty and blocked, resulting in poor heat dissipation
D. Too little refrigerant charge
Answer: ABCD
What are the possible reasons for the failure of the humidification function of the NETCOL5000-A air conditioner? (Multiple choice)
A. The indoor temperature is low
B. Humidifier damage
C. Humidifier circuit is not closed
D. The outdoor unit is not running
Answer: BCD
What are the factors that affect the service life of the battery? (Multiple choice)
A. Temperature
B. Cycle times
C. Depth of Discharge
D. Rated capacity
Answer: ABC
When the ECC800 detects that the connection signal to the device is interrupted, it will generate a communication interruption alarm. What are the possible reasons? (Multiple choice)
A. The power supply is abnormal
B. Loose cable connection
C. Poor cable contact
D. Equipment failure
Answer: ABCD